President Tinubu to Unveil Blueprint to Connect all Parts of Nigeria with Rail lines Soon – Dr Opeifa

0
434
Dr Kayode Opeifa, MD, NRC.

By Shola Fadeyi

Strong indications have emerged that the Federal Government will soon unveil details of its Agenda  for the  connection of all major cities and towns in Nigeria with Rail lines ,as part of measures to enhance the nation’s economic development.

The Managing Director of the Nigerian Railway Corporation (NRC), Dr Kayode  Opeifa made this disclosure  today, when he appeared as a Guest on the TVC  News  Breakfast  Programme and spoke on the Topic:  ” Revitalizing Rail Transport- Train Services Resume in Jos’’, monitored by the Marine  and Economy Online .

He said the plan of President Tinubu’s Administration for the NRC  is part of Government’s efforts to revitalize rail transport in the country under the National Rail line programme, which will also witness the connection of  all the ports in the country  to rail lines  and  tied to the expansion of the ongoing rail modernisation plan on the standard gauge.

Dr Opeifa pointed out that there is a plan to connect major cities of Nigeria  as manifested with the Jos situation, adding that there is also a plan  to expand the ongoing rail modernization plan as well as other new lines  , which announcement will be made on or  before  October 1,  and  which will result to large  connections to many towns and cities.

The NRC MD stated that the Regional Development Commission plan  is also being worked on , saying that what is being done is integrating all these plans with the National Rail Corridor.

Explaining  further ,he said   there is the Western Line, Lagos to Kano, its  narrow gauge as well as the Lagos to Kano, the  standard gauge which will  be affected positively, adding that the Minister of Transportation mentioned recently in Kaduna how far the nation  has fared  on the Kano-Kaduna line and how far with the  Kano-Maradi line as part of the ongoing expansion of the rail network.

He  explained that the situation is that the  Abuja-Kaduna  line will now be linked to Abuja-Kano within the next 12 months to 24 months, following which the development will now move from  Ibadan to Oshogbo and  possibly to Oyo, and then to Ilorin.

According to him , on the Eastern plan, the connection  will move  from Aba to Enugu and from Aba to Umuahia and Umuahia  to Enugu and then  Makurdi to Lafia and then to  Maiduguri.

He said the plan is an ambitious one which will gulp a lot of money but which the government is determined to pursue to give the people the dividends of democracy.

On the issue of Port connectivity to the rail lines,  which will connect all the seaports in Nigeria,Opeifa stated that the plan, which has commenced in Apapa Port at the PTML Terminal,will soon be extended to Tin Can Port, Onne Port, Port- Hacourt Port and Warri Port.

According to him , as it concerns   Apapa Port to Lagos Port, The train currently gets to Lagos Port, which is both on  narrow gauge and standard gauge but the main container terminal at the Tin Can Port, will eventually get connected adding that  the  same way the Warri  Port will be connected to Warri on the Central line, that is Warri Port to Warri Town, that will take people  to Itakpe, and eventually a connection to Abuja.

He stated that with the  Port Hacourt  line,the narrow gauge, is going to be extended down to Onne Port and from  Aba before  moving  to Umuahia ,Enugu and then Uyo saying   that there is also a plan to connect the Lekki Deep Sea Port to the Lagos-Kano line via Kajola , eventually going to Benin,  Onitsha, Enugu, and the rest on the standard route.

He said  there has also been a  borrowing plan approved by the National Assembly for some of these lines.

According  to him , the plan is extensive while  the President will eventually unveil it all  in the   national rail  plan for the ports in line with  the Vision 5, 10, 20, 30. detailing what the government  will do in  the first five years and how it will  transit to renewable energy in the first five years to ten years when it will  start going electric ,while the issue of fast train will also be captured during the period.