Warri–Itakpe Train Service Resumes Wednesday, Oct 29

0
227

 .Online Booking Portal , Schedule Ready since Monday

The Nigerian Railway Corporation (NRC) has said  that it would officially resume  full operations of the Warri–Itakpe Train Service (WITS) on  Wednesday, 29th October, 2025,   after a temporary suspension  on the corridor.

It attributed the  temporary suspension, which it described as  necessary ,to the need to  carry out critical repairs, maintenance, and system checks on the track and rolling stock to ensure the comfort, reliability and safety of passengers.

To lend credence to its readiness , the NRC has already opened its  online booking portal  since  12 noon on Monday, October 27, 2025, about 48 hours ahead of resumption, via https://nrc-fane.ng. It  encouraged passengers  to secure their tickets early through the portal or at designated stations.

It has also released the  train timetable, incorporating temporary speed restrictions (TSR) for safety and operational monitoring ,since  Monday.

The Corporation said it is to  commence operation  with seven coaches, comprising six standard class and one business class.

It  sincerely apologized to its esteemed passengers and stakeholders for the inconveniences experienced during the period of suspension and appreciates their patience and understanding.

In his reaction to the proposed resumption, The Managing Director, Dr. Kayode Opeifa, assured the traveling public of the NRC’s renewed commitment to safe, reliable, and efficient rail services as passenger operations resume fully on the Warri–Itakpe corridor.