FG to Open 2nd Niger Bridge May 15 as Buhari Inaugurates Lagos Ibadan Expressway, April 30

0
395
Second Niger Bridge

The Federal Government has said that  the Second Niger Bridge will be fully opened to motorists on May 15, 2023, while the   Lagos Ibadan Expressway, which is still under construction , would be inaugurated by President Muhammadu Buhari   on April 30, 2023.

 

The Minister of Works and Housing, stated this, while inspecting and confirming the completion of the Loko-Oweto Bridge and link roads between Benue and Nasarawa states.

 

Fashola said the project was undergoing necessary finishing works such as lane markings and others, adding  that the flag-off ceremony will be formally done by the President Muhammadu Buhari.

 

Fashola said his Ministry has had  a periodic meeting in the office of the Chief of Staff to the President where the contractors, and the Ministry’s team , all reviewed the challenges [on the Second Niger Bridge] and how to solve them.

 

“The link road [of the bridge] that we formally opened to traffic, the date we have now is the 15th of May. We are rolling out all the steps to support the contractor to see that date is achieved.

 

“A lot of snag resolutions are going to start; lane marking on the bridge will soon start and erection of signage will also soon start. Just about two weeks before the end of the term, the President will be invited to the completion, and maybe any day thereafter, he will be able to fly in and do the ceremony. But by the 15th of May, the bridge should be fully open to traffic”, Fashola said.

The Minister  also  assured that the Lagos-Ibadan expressway will be completed by April 30.

On December 15, 2022, the federal government opened the Second Niger Bridge for use, in order to ease traffic in the south-east during the festive season.The bridge was also  opened for one month during the yuletide, and later closed to traffic on January 15, 2023.

The need to make the April 30, 2023 date for the inauguration of the Lagos Ibadan Expressway a reality, has led to an increase in the pace of construction  work  on the  last lap of the Kara – Opic , Berger  and Secretariat section of the Highway  , thus exacerbating the congestion on the road.

This has made the Federal Ministry of Works and Housing to advise   motorists to use the Lekki-Epe Expressway, and the Ikorodu – Sagamu expressways as alternative routes, so as to reduce the congestion on the highway, while it also adopted other novel  strategies to ameliorate the congestion and speed up the construction pace , so as to achieve the proposed  inauguration date.